Diagnosis Procedure
- CHECK FUSE AND FUSIBLE LINK
Check that the following fuse and fusible link are not blown.
Terminal No. Signal name Fuse and fusible link No. 1 Battery power supply K (40 A) 11 10 (10 A) Is the fuse fusing?
YES
Replace the blown fuse or fusible link after repairing the affected circuit if a fuse or fusible link is blown.
NO
GO TO STEP 2 .
- CHECK POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect BCM connectors.
- Check voltage between BCM harness connector and ground.
(+) (-) Voltage
(Approx.)BCM Connector Terminal M118 1 Ground Battery voltage M119 11
Is the measurement value normal?
YES
GO TO STEP 3 .
NO
Repair harness or connector.
- CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
BCM Ground Continuity Connector Terminal M119 13 Existed Does continuity exist?
YES
INSPECTION END
NO
Repair harness or connector.