Component Inspection (Pre-Charge Relay)
WARNING: This page is about a different variant/trim than selected.
- CHECK PRE-CHARGE RELAY-1
- Disconnect battery junction box harness connector.
- Check the continuity between battery junction box harness connector terminals.
Battery junction box Continuity Terminal 24 8 Existed - Also check harness for short to ground and to power.
Is the inspection result normal?
YES
GO TO STEP 2 .
NO
Replace battery junction box. Refer to DISASSEMBLY AND ASSEMBLY .
- CHECK PRE-CHARGE RELAY-2
Check the continuity between battery junction box harness connector terminals as per the following condition.
Battery junction box Condition Continuity Terminal 22 30 12 V direct current supply between terminals 24 and 8 of battery junction box harness connector Existed No current supply Not existed Is the inspection result normal?
YES
INSPECTION END
NO
Replace battery junction box. Refer to DISASSEMBLY AND ASSEMBLY .