Diagnosis Procedure
- CHECK INTEGRAL SWITCH POWER SUPPLY AND GROUND CIRCUIT
Check integral switch power supply and ground circuit. Refer to DIAGNOSIS PROCEDURE .
Is the inspection result normal?
YES
GO TO STEP 2 .
NO
Repair or replace malfunctioning parts.
- CHECK AV COMMUNICATION CIRCUIT
- Turn ignition switch OFF.
- Disconnect display control unit harness connector and integral switch harness connector.
- Check the continuity between display control unit harness connector and integral switch harness connector.
Display control unit Integral switch Continuity Connector Terminal Connector Terminal M100 16 M1 3 Existed 28 4
Is the inspection result normal?
YES
Replace integral switch. Refer to REMOVAL AND INSTALLATION .
NO
Repair or replace malfunctioning parts.