LEMON Manuals: Even more car manuals for everyone
Home >> Infiniti >> 2013 >> FX37 Base, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 6 (Heater & Air Conditioning System) >> Removal And Installation >> Cooler Pipe And Hose >> High-Pressure Flexible Hose >> HIGH-PRESSURE FLEXIBLE HOSE: Removal and Installation >> Installation

HIGH-PRESSURE FLEXIBLE HOSE: Removal and Installation: Installation

WARNING: This page is about a different car, the 2013 Infiniti FX50. However, it is still accessible from the selected car via links, so may be relevant.

Note the following items, and then install the reverse order of removal.

CAUTION:
  • Replace O-rings with new ones. Then apply compressor oil to them when installing.
  • Female-side piping connection is thin and easy to deform. Slowly insert the male-side piping straight in axial direction.
  • Insert piping securely until a click is heard.
  • After piping connection is completed, pull male-side piping by hand to make sure that connection does not come loose.
  • Check for leakages when recharging refrigerant.