LEMON Manuals: Even more car manuals for everyone
Home >> Infiniti >> 2011 >> G37 Base, 2D Convertible >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter, Warning Lamp & Indicator -- G37 Convertible >> DTC/Circuit Diagnosis >> Parking Brake Switch Signal Circuit >> Diagnosis Procedure (M/T models)

Diagnosis Procedure (M/T models)

  1. CHECK COMBINATION METER INPUT SIGNAL
    1. Turn ignition switch ON.
    2. Check the voltage and waveform between combination meter harness connector terminal and ground.
      VOLTAGE REFERENCE CHART

      Terminals Condition Voltage (Approx.)
      (+) (-)
      Combination meter
      Connector Terminal
      M53 27 Ground Parking brake applied 0 V
      Parking brake released
      G07159215Courtesy of NISSAN MOTOR CO., U.S.A.

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Go to 2.

  2. CHECK PARKING BRAKE SWITCH SIGNAL CIRCUIT
    1. Turn ignition switch OFF.
    2. Disconnect combination meter connector and parking brake switch connector.
    3. Check continuity between combination meter harness connector terminal and parking brake switch harness connector terminal.
      CONTINUITY REFERENCE CHART

      Combination meter Parking brake switch Continuity
      Connector Terminal Connector Terminal
      M53 27 B14 1 Existed
    4. Check continuity between combination meter harness connector terminal and ground.
      CONTINUITY REFERENCE CHART

      Combination meter Ground Continuity
      Connector Terminal
      M53 27 Not existed

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Repair harness or connector.