Removal and Installation: Installation
Install in the reverse order of removal.
CAUTION:
When connecting, connect the battery cable to the positive terminal first.
Battery fix frame mounting nut
Torque specifications: 3.9 N.m (0.40 kg-m, 35 in-lb)
Battery terminal nut
Torque specifications: 5.4 N.m (0.55 kg-m, 48 in-lb)
Reset electronic systems as necessary. Refer to "ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL : REQUIRED PROCEDURE AFTER BATTERY DISCONNECTION ".