Actuator Test Check
- Connect GDS to Data Link Connector(DLC)
- IG key "ON"
- Perform Actuator Test with GDS
Active Air Flap Potentiometer Status : 20% or 80% ± 5%
- Is the operation in normal?
YES
- Go to next procedure.
NO
- Substitute with a known-good A.A.F and check for proper operation. If the problem is corrected, replace A.A.F and then go to "Verification Of Repair " procedure.