Repair Procedures: Installation
WARNING: This page is about a different variant/trim than selected.
- Install in the reverse order of removal.
- Refill the engine with engine oil.
(Refer to Lubrication System - "ENGINE OIL ")
- Refill the radiator and reservoir tank with engine coolant.
(Refer to Cooling System - "COOLANT ")
NOTE: Make sure to refill the engine coolant following the ITM coolant filling procedure.
After installation is completed, perform the followings.- Refill the transaxle with fluid.
- Inspect for fuel leakage.
- After assembling the fuel line, turn on the ignition switch (do not operate the starter) so that the fuel pump runs for approximately 2 seconds and fuel line pressurizes.
- Repeat this operation 2 or 3 times, then check for fuel leakage at any point in the fuel line.
- Clean battery & cable terminals with sand paper and then assemble them.
Apply grease to prevent corrosion.