Component Inspection
WARNING: This page is about a different variant/trim than selected.
- IG "OFF" & Disconnect RCV connector.
- Measure resistance between power and control terminals of RCV connector.(Component side)
Specification: 29.7 ± 1.4 Ω (20°C (68°F))
- Is the measured resistance within specification?
YES
- Substitute with a known - good ECM and check for proper operation. If the problem is corrected, replace ECM and go to "VERIFICATION OF VEHICLE REPAIR " procedure.
NO
- Substitute with a known - good RCV and check for proper operation. If the problem is corrected, replace RCV and go to "VERIFICATION OF VEHICLE REPAIR " procedure.