Signal Circuit Inspection
WARNING: This page is about a different variant/trim than selected.
■ Check resistance
- IG "OFF". Disconnect IATS connector and PCM connector.
- Measure the resistance between signal terminal of IATS harness connector and chassis ground.
Specification: Infinite
- Is resistance within the specification?
YES
- Go to next step below.
NO
- Repair as necessary and go to "W/Harness Inspection" procedure.