Installation Procedure
WARNING: This page is about a different car, the 2007 Hummer H2. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
Preheat the sheet metal in order to melt the sealer and bond the molding into the joint. Sealer begins to flow at approximately 93°C (200°F).
- Use a heat gun in order to heat the cab in the joint area. Preheat the sheet metal to approximately 93°C (200°F).
- Install the molding.
- Use a roller to completely wet-out the adhesive bond.
- Install the luggage carrier, if equipped. Refer to Luggage Carrier Replacement (SUT) or Luggage Carrier Replacement (SUV) .