LEMON Manuals: Even more car manuals for everyone
Home >> Hummer >> 2008 >> H2 4D Utility Wagon >> Repair and Diagnosis >> External Pages >> Different car >> Section 506 (Automatic Transmission - 6L80/6L90 - Diagnostic Information And Procedures) >> Diagnostic Information and Procedures >> DTC P0716 or P0717 >> Circuit/System Testing

Circuit/System Testing

WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2012 GMC Yukon XL, 2012 GMC Yukon, 2012 Chevrolet Tahoe, 2012 Chevrolet Suburban, and 2012 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
    NOTE:

    You must perform the Circuit/System Verification first.

  1. Ignition OFF, remove the Q8 control solenoid valve assembly. Refer to Control Solenoid Valve and Transmission Control Module Assembly Replacement .
  2. Connect the DT-47825-10  jumper harness between the vehicle wire harness electrical connector, and the Q8 control solenoid valve assembly electrical connector.
  3. Ignition ON, test for 8.3-9.3 volts between the ISS/OSS voltage circuit terminal B on the Q8 control solenoid valve assembly and ground at the transmission case.
    • If not between 8.3-9.3 volts 

      Replace the Q8 control solenoid valve assembly.

    • If between 8.3-9.3 volts 
  4. Perform the Control Solenoid Valve and Transmission Control Module Assembly Input Shaft Speed/Output Shaft Speed Input Test .
    • If the Q8 control solenoid valve assembly does not pass the ISS/OSS test 

      Replace the Q8 control solenoid valve assembly.

    • If the Q8 control solenoid valve assembly passes the ISS/OSS test 
  5. Inspect the machined teeth on the 1-2-3-4 and 3-5 clutch housing outer surfaces for damage or misalignment.
    • If the machined surfaces are incorrect, damaged, or improper alignment 

      Repair or replace as necessary.

    • If the machined surfaces and alignment checks OK 
  6. Replace the B14A/B14C ISS/OSS assembly.