Component Testing
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2012 GMC Yukon XL, 2012 GMC Yukon, 2012 Chevrolet Tahoe, 2012 Chevrolet Suburban, and 2012 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
- Ignition OFF, disconnect the Run/Crank relay.
- Test for 70-150 ohms between terminals 85 and 86.
- If the resistance is not within the specified range, replace the relay.
- Test for infinite resistance between the following terminals:
- 30 and 86
- 30 and 87
- 30 and 85
- 85 and 87
- If less than specified, replace the relay.
- Install a 3-amp fused jumper wire between relay terminal 85 and 12 volts. Install a jumper wire between relay terminal 86 and ground. Measure for less than 5 ohms between terminals 30 and 87.
- If greater than specified, replace the relay.