Installation Procedure
- Install the tow hook to the frame rail.
- Install the bolts to the tow hook through the frame rail.
Tighten: Tighten the bolts to 95 N.m (70 lb ft).
- Install the front bumper. Refer to Front Bumper Replacement .
NOTE:
Refer to Fastener Notice
.