Installation Procedure
- Connect the electrical connections to the cluster.
- Position the I/P cluster to the instrument panel.
- Install the screws to the instrument panel cluster.
Tighten: Tighten the screws to 2 N.m (18 lb in).
- Install the instrument cluster trim plate. Refer to Instrument Cluster Trim Panel Replacement
.
When the I/P cluster is replaced the new I/P cluster will need to be programmed. Refer to Instrument Cluster Programming and Setup .
NOTE:
Refer to Fastener Notice
.