LEMON Manuals: Even more car manuals for everyone
Home >> Honda >> 2021 >> CR-V EX-L, AWD >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Engine Control System / Engine Mechanical - Testing & Troubleshooting (Except Hybrid) >> Removal & Installation Inspection >> Turbocharger Bypass Control Solenoid Valve Removal, Installation, and Inspection (1.5 L Engine) >> Removal and Installation

Removal and Installation

Fig 1: Turbocharger Bypass Control Solenoid Valve Replacement Components With Torque Specifications
GHH427194Courtesy of HONDA, U.S.A., INC.
Torque: N.m (kgf.m, lbf.ft)
  1. Hoses - Disconnect
  2. Turbocharger Bypass Control Solenoid Valve - Remove
  3. All Removed Parts - Install
    1. Install the parts in the reverse order of removal.