Removal and Installation
1
| Torque: N.m (kgf.m, lbf.ft) | |
| Replace |
- Engine Coolant - Drain
- Air Cleaner - Remove
- ECT Sensor 1 - Remove
- Thermostat - Remove
- ATF Warmer Hose - Disconnect
- Bracket - Remove
- Thermostat Housing - Remove
- Connecting Pipe - Remove
- All Removed Parts - Install
1. Install the parts in the reverse order of removal. NOTE: After installing all the removed parts, refill the radiator with engine coolant, and bleed the air from the cooling system .