Inhibitor Solenoid Removal/Installation
- Disconnect the inhibitor solenoid 2P connector (A).
- Remove the inhibitor solenoid (B), then remove the O-rings (C) from the inhibitor solenoid.
- Install the two O-rings on the inhibitor solenoid, then install the inhibitor solenoid on the CVT driven pulley pressure control solenoid valve (D).
- Connect the inhibitor solenoid 2P connector.