LEMON Manuals: Even more car manuals for everyone
Home >> Honda >> 2013 >> CR-Z Base, Automatic CVT Trans >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> Engine Cooling System >> Thermostat Housing Removal and Installation >> Installation

Thermostat Housing Removal and Installation: Installation

  1. Install the thermostat housing (A) with a new connecting pipe O-ring (B).
    Fig 1: Thermostat Housing, O-Ring, Heater Hose And Water Bypass Hoses With Torque Specifications
    G06949655Courtesy of AMERICAN HONDA MOTOR CO., INC.
  2. Connect the heater hose (C) and the water bypass hoses (D).
  3. Install the thermostat (see THERMOSTAT HOUSING REMOVAL AND INSTALLATION  ).
  4. Install the harness holder.
    Fig 2: Harness Holder With Mounting Bolt Torque Specification
    G06949656Courtesy of AMERICAN HONDA MOTOR CO., INC.
  5. Install the coolant reservoir.
    Fig 3: Coolant Reservoir With Torque Specifications
    G06949657Courtesy of AMERICAN HONDA MOTOR CO., INC.
  6. Refill the radiator with engine coolant, and bleed the air from the cooling system (see COOLANT REPLACEMENT  ).
  7. Clean up any spilled engine coolant.