LEMON Manuals: Even more car manuals for everyone
Home >> Honda >> 2000 >> CR-V SE, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 19 (Power Recirculating Ball) >> Overhaul >> Worm Shaft, Stub Shaft & Valve Body (Hombre) >> Reassembly

Worm Shaft, Stub Shaft & Valve Body (Hombre): Reassembly

WARNING: This page does not describe the selected car, but rather 15 other vehicles, including the 2000 Isuzu VehiCROSS, 2000 Isuzu Trooper, 2000 Isuzu Rodeo, 2000 Isuzu Hombre, and 2000 Isuzu Amigo. However, it is still accessible from the selected car via links, so may be relevant.
  1. Lubricate valve body components with power steering fluid. Install NEW rings and seals. Lubricate spool valve seals with power steering fluid and install on valve spool. Carefully insert valve spool into valve body.
  2. Push valve spool through valve body until locating pin hole is visible at opposite end of valve body, and valve spool is flush with notched end of valve body. Install stub shaft into valve spool and valve body.
  3. Align stub shaft locating pin with valve spool locating hole. Align notch in stub shaft cap with pin in valve body. Install stub shaft seal into valve body.
    CAUTION: Before installing assembled valve body into gear housing, ensure valve body stub shaft locating pin is fully engaged in stub shaft cap notch. DO NOT allow stub shaft to disengage from valve body pin.
  4. Install bearing and races on worm shaft, aligning marks made during disassembly. See Figure. Install worm shaft onto valve body and stub shaft assembly, aligning notches made during disassembly.