LEMON Manuals: Even more car manuals for everyone
Home >> Geo >> 1994 >> Tracker Base, 1.6 6, RWD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 1.6L 4-CYL - VINS [U,6] >> Overhaul >> Rocker Arm Assembly

Rocker Arm Assembly

  1. Disassemble rocker arm shaft assembly. Inspect components for excessive wear or damage.
  2. Measure O.D. of rocker arm shaft in rocker arm operating areas. Measure I.D. of rocker arm. Determine oil clearance. Replace components if not within specification. See ROCKER ARM ASSEMBLY SPECIFICATIONS table.
  3. Using dial indicator and "V" blocks, check rocker arm shaft runout. Replace shaft if runout exceeds specification. See ROCKER ARM ASSEMBLY SPECIFICATIONS table. To reassemble, coat components with engine oil and reverse disassembly procedure.
ROCKER ARM ASSEMBLY SPECIFICATIONS

Application In. (mm)
Rocker Arm I.D. .630-.631 (16.00-16.02)
Rocker Arm Shaft O.D. .628-.629 (15.97-15.99)
Rocker Arm Shaft Oil Clearance
8-Valve .0005-.0017 (.013-.043)
16-Valve .0001-.0014 (.003-.036)
Rocker Arm Shaft Runout
8-Valve .004 (.10)
16-Valve .008 (.20)