Piston & Rod Assembly: Installation
WARNING: This page is about a different car, the 1989 Suzuki Swift, 1989 Suzuki Sidekick, and 1989 Suzuki Samurai. However, it is still accessible from the selected car via links, so may be relevant.
- Lubricate all internal surfaces with engine oil before installation. Ensure that arrow on piston head faces front of engine. Ensure that lubrication jet in connecting rod faces intake side of engine.
- Position piston ring gaps. See Fig 1 . Connecting rod side clearance limit is .0137" (.35 mm). Install cylinder head, oil pick-up screen and oil pan. Reverse removal procedure to complete installation.