LEMON Manuals: Even more car manuals for everyone
Home >> Geo >> 1990 >> Metro LSi, 2D Hatchback, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 5 (1.3L 4-CYL - VIN [3] & 1.6L 4-CYL - VIN [0]) >> Removal & Installation >> Intake Manifold >> Removal

Intake Manifold: Removal

WARNING: This page is about a different car, the 1991 Suzuki Swift, 1991 Suzuki Sidekick, and 1991 Suzuki Samurai. However, it is still accessible from the selected car via links, so may be relevant.
  1. Release fuel pressure. See FUEL PRESSURE RELEASE  under REMOVAL & INSTALLATION. Disconnect negative battery cable. Drain cooling system. Remove air intake hoses and air breather hoses.
  2. Remove air cleaner assembly. Disconnect all electrical connections from intake manifold, injectors and throttle body. Disconnect vacuum hoses from intake manifold.
  3. Disconnect coolant hoses from manifold and remove upper radiator hose. Remove fuel supply and return lines from delivery pipe. On Sidekick, remove throttle body. On Swift GT, remove injector connectors. On all models, disconnect all control cables.
  4. Remove intake manifold-to-cylinder head bolts. Remove intake manifold and gasket. Remaining components can be removed from intake manifold as required.