Removal And Installation: Installation
- Install the USB jack.
- Install the console upper tray.
- Install the floor console assembly.
- Connect the negative (-) battery connector.NOTE:
- Make sure that the cables and connectors are plugged in properly.
- Check if the AVN system is operating normally.