Actuator Test Check
- Connect GDS to Data Link Connector (DLC)
- IG key "ON".
- Perform Actuator Test with GDS.
Active Air Flap Potentiometer Status: 20% or 80% ± 5%
- Is the operation in normal?
YES
- Go to next procedure.
NO
- Substitute with a known-good A.A.F. and check for proper operation. If the problem is corrected, replace A.A.F. and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.