Installation Procedure
Ensure the cylinder head locating pins (5) are securely mounted in the engine block deck face.
- Install a NEW cylinder head gasket (4) using the deck face locating pins for retention.
- Cylinder Head (3) - Install
-
Courtesy of GENERAL MOTORS COMPANY
CAUTION:Refer to Fastener Caution .
CAUTION:This vehicle is equipped with torque-to-yield or single use fasteners. Install a NEW torque-to-yield or single use fastener when installing this component. Failure to replace the torque-to-yield or single use fastener could cause damage to the vehicle or component.
Cylinder Head Bolt - M8 x 80.8 (3) - Install NEW and tighten in sequence [2x]
- First Pass: 15 N.m (11 lb ft)
- Final Pass: 75 degrees
- Cylinder Head Bolt - M11 x 178 (4) - Install NEW and tighten in sequence [8x]
- First Pass: 60 N.m (44 lb ft)
- Final Pass: 185 degrees
- CAUTION:
Do not apply more room temperature vulcanization (RTV) silicone than specified. Excess RTV silicone could plug up oil passage holes in the camshaft carrier and lead to engine damage.
NOTE:Camshaft carrier surfaces should be free and clean of oil and foreign substances.
NOTE:Ensure proper use of room temperature vulcanizing (RTV) sealant. Use of Room Temperature Vulcanizing (RTV) and Anaerobic Sealant
Place a 3 mm (0.118 in) bead of RTV sealant (1) on the bottom of the camshaft carrier, following the specific bead path. Adhesives, Fluids, Lubricants, and Sealers
- Place a 5 mm (0.197 in) bead of RTV sealant (1) on the bottom of the camshaft carrier as arrows show. Adhesives, Fluids, Lubricants, and Sealers
- Camshaft Carrier (2) - Install
- Camshaft Carrier Bolt (3) - Install and tighten in sequence [13x]
- First Pass: 6 N.m (53 lb in)
- Final Pass: 60 degrees
- Camshaft-Left Side - Install - Camshaft Replacement - Left Side
- Position wire harness and connect as necessary.
- Install ground wire and ground wire bolt at the rear of the cylinder head. Tighten bolt to 15 N.m (11 lb ft)
Battery Negative Cable (2) @ Cylinder Head - Install - Battery Negative Cable Replacement (LGX)
Oil Level Indicator Tube (1) - Install - Oil Level Indicator Tube Replacement
Warm Up Three-Way Catalytic Converter (2) @ Bank 2 - Install - Warm Up Three-Way Catalytic Converter Replacement (Bank 2, LGX)
-
Courtesy of GENERAL MOTORS COMPANY
Fuel Injection Fuel Rail Assembly-Bank 2 (2) - Install - Fuel Injection Fuel Rail Assembly Replacement - Bank 2
- Camshaft Timing Chain-Left Side - Install - Camshaft Timing Chain Assembly Replacement - Left Side
Refer to Fastener Caution .