LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2011 >> Yukon Base, 5.3 3 >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 13 (Automatic Transmission - 2ML70 - Diagnostic Information And Procedures) >> Diagnostic Information and Procedures >> DTC P0815, P0816, or P0826 >> Circuit/System Testing

Circuit/System Testing

WARNING: This page is about a different variant/trim than selected.
  1. Ignition OFF, disconnect the harness connector at the S2 transmission manual shift switch.
  2. Ignition ON, verify that a test lamp illuminates between the B+ circuit terminal 4 and ground.
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance.
  3. Verify the scan tool Driver Shift Request parameter is Invalid.
    • If not the specified value, test the signal circuit terminal 3 for a short to voltage. If the circuit tests normal, replace the K9 BCM.
  4. Install a 6.5-7.0 K Ω jumper wire between the signal circuit terminal 3 and the B+ circuit terminal 4. Verify the scan tool Driver Shift Request parameter is None.
    • If not the specified value, test the signal circuit for an open/high resistance. If the circuit tests normal, replace the K9 BCM.
  5. If all circuits test normal, test or replace the S2 transmission manual shift switch.