LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2006 >> Sierra 1500 HD, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 942 (Engine Controls And Fuel - 6.6L (LMM) - DTC P154B To DTC P2693) >> DTC P2564 or P2565 >> Circuit/System Testing

Circuit/System Testing

WARNING: This page is about a different car, the 2007 GMC Sierra, 2007 GMC Cab & Chassis Sierra, 2007 Chevrolet Silverado, and 2007 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the harness connector at the TC vane position sensor.
  2. Ignition OFF for 90 seconds, test for less than 5 ohms of resistance between the low reference terminal C and ground.
    • If greater than the specified range, test the low reference circuit for an open/high resistance. If the circuit tests normal, replace the ECM.
  3. Ignition ON, test for 4.8-5.2 volts between the 5-volt reference circuit terminal D and ground.
    • If less than the specified range, test the 5-volt reference circuit for a short to ground or an open/high resistance. If the circuit tests normal, replace the ECM.
    • If greater than the specified range, test the 5-volt reference circuit for a short to voltage. If the circuit tests normal, replace the ECM.
  4. Verify the scan tool TC Vane Position Sensor parameter is less than 2 percent.
    • If greater than the specified range, test the signal circuit terminal B for a short to voltage. If the circuit tests normal, replace the ECM.
  5. Install a 3A fused jumper wire between the signal circuit terminal B and the 5-volt reference circuit terminal D. Verify the scan tool TC Vane Position Sensor parameter is greater than 98 percent.
    • If less than the specified range, test the signal circuit for a short to ground or an open/high resistance. If the circuit tests normal, replace the ECM.
  6. If all circuits test normal, test the TC vane position sensor.