Installation Procedure
WARNING: This page is about a different car, the 2007 GMC Sierra, 2007 GMC Cab & Chassis Sierra, 2007 Chevrolet Silverado, and 2007 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install a NEW EGR valve cooler gasket onto the cooler studs, and install the EGR cooler.
- Install the front EGR valve cooler bolts (1).
Tighten: Tighten the bolts to 50 N.m (37 lb ft).
- Install the rear EGR valve cooler bolts (1).
Tighten: Tighten the bolts to 25 N.m (18 lb ft).
- Install the right exhaust pipe to EGR valve cooler nuts (2).
Tighten: Tighten the nuts to 53 N.m (39 lb ft).
- Position the EGR valve cooler coolant hose, and install the hose to the EGR valve cooler.
- Position the EGR valve cooler coolant hose clamp (1).
- Install the EGR valve cooler coolant hose clamp nut (2).
Tighten: Tighten the nut to 24 N.m (18 lb ft).
- Position the heater inlet hose and install the hose to the EGR valve cooler.
- Position the heater inlet hose clamp (1) at the EGR valve cooler.
- Install the intake manifold tube. Refer to Intake Manifold Tube Replacement .
- Install the air intake pipe. Refer to Air Intake Pipe Replacement .
- Install the charger air outlet pipe. Refer to Charge Air Cooler Outlet Pipe Replacement .
- Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) or Cooling System Draining and Filling (Vac-N-Fill) .
NOTE:
Refer to Fastener Notice
.