Circuit/System Testing
WARNING: This page is about a different car, the 2007 GMC Sierra and 2007 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Ignition OFF, disconnect the harness connector X2 at the ECM.
- Ignition ON, verify that the wait to start indicator is OFF.
- If not OFF, test the wait to start indicator control signal circuit for a short to ground. If the circuit tests normal, replace the instrument panel cluster (IPC).
- Install a 3-amp fused jumper between the wait to start control signal circuit and ground. Verify that the wait to start indicator is ON.
- If not ON, test the wait to start indicator control signal circuit for a short to voltage or an open/high resistance. If the circuit tests normal, replace the IPC.
- If all circuits test normal, replace the ECM