Installation Procedure
WARNING: This page is about a different car, the 2010 GMC Sierra and 2010 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Set the bottom of ECM into the ECM bracket tab (2).
- Push the ECM (3) in securing the ECM to the bracket.
- Position the engine wiring harness electrical connectors and engage the retainers securing the connectors (2) to the ECM (1).
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Single Battery) or Battery Negative Cable Disconnection and Connection (Dual Batteries) or Battery Negative Cable Disconnection and Connection (Auxiliary Battery) .
- If a NEW ECM was installed, program the ECM. Refer to Control Module References .