Valve Rocker Arm and Push Rod Installation
WARNING: This page is about a different car, the 2003 GMC Savana and 2003 Chevrolet Chevy Express. However, it is still accessible from the selected car via links, so may be relevant.
Important: Be sure to keep parts in order. Parts must be reinstalled into the original location and position.
- Install the valve pushrods.
Important: Be sure that the arrow on the valve rocker arm support is in the up position.
- Install the valve rocker arm supports.
- Apply prelube GM P/N 12345501 (Canadian P/N 992704) or equivalent, to the following valve rocker arm contact surfaces:
- Valve pushrod socket (1)
- Roller pivot (2)
- Valve stem tip (3)
- Install the valve rocker arm assemblies as follows:
- Finger start the bolt at location (1)
- Finger start the bolt at location (2)
- Finger start the bolt at location (3)
- Finger start the remaining valve rocker arm bolts
- Rotate the crankshaft balancer to position the crankshaft balancer alignment mark (1) 57-63 degrees clockwise or counterclockwise from the engine front cover alignment tab (2).CAUTION: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Important: Once the valve rocker arm assemblies are installed and properly torqued, no additional valve lash adjustment is required.
- Tighten the valve rocker arm bolts.
Tighten
Tighten valve rocker arm bolts to 30 N.m (22 lb ft).