Circuit/System Testing
WARNING: This page is about a different car, the 2009 GMC Sierra, 2009 GMC Cab & Chassis Sierra, 2009 Chevrolet Silverado, and 2009 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
You must perform the Circuit/System Verification before proceeding with Circuit/System Testing.
- Test the IAH current signal circuit between IAH terminal 4 X1 and GPCM terminal 29 X2 for an open, a short to ground, or a short to voltage:
- Ignition OFF, disconnect the X1 harness connector of the IAH. Connect any other circuits that were previously disconnected.
- Turn ON the ignition. With a DMM measure between command 2 circuit terminal 3 of the connector and a good ground for 0.78-1.1 Hz.
- If the DMM does not measure between 0.78-1.1 Hz, replace the GPCM.
- Do not supply 12 volts to terminal 2 on the IAH for more than 20 seconds.
- Set the DMM to the 4V DC hertz scale.
- Turn OFF the ignition. Install a jumper wire between temperature signal circuit terminal 1 of the connector and the corresponding terminal on the IAH.
- Install a jumper wire between the IAH harness command 2 circuit terminal 3 of the connector and the corresponding terminal on the IAH.
- Supply 12 volts to terminal 2 on the IAH.
- Turn ON the ignition. Measure for 1 hertz on terminal 4 at the IAH.
- If 0.7-1.1 hertz is measured on terminal 4, replace the GPCM.
- If 0.7-1.1 hertz is not measured on terminal 4, replace the IAH.
IMPORTANT:
Set the DMM to the 4V DC hertz scale.
IMPORTANT: