Circuit/System Testing
WARNING: This page is about a different car, the 2009 GMC Sierra, 2009 GMC Cab & Chassis Sierra, 2009 Chevrolet Silverado, and 2009 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Ignition OFF, disconnect the park enable PCB relay.
- Connect a test lamp between the park enable signal circuit and battery positive voltage.
- Ignition ON, transmission in PARK, verify the test lamp does not illuminate.
- If the test lamp illuminates, test for a short to ground on the park enable signal circuit. If the circuit tests normal and the DTC is current, replace the BCM.
- If the circuit tests normal and the DTC is current, test or replace the park enable PCB relay.