P1B05 and P1B06 with P1AE2
WARNING: This page is about a different car, the 2009 GMC Sierra and 2009 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Ignition OFF, wait 2 minutes.
- Disconnect PIM connector X1.
- Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
- Ignition ON, observe the BECM HVIC Source Current parameter.
- If the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal 1 and terminal 23. If the terminal contact tests normal, replace the PIM.
- Remove the PIM terminal 1 to terminal 23 fused jumper wire.
- Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
- If within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.WARNING: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:- Identify how to disable high voltage.
- Identify how to test for the presence of high voltage.
- Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death. - If the circuit tests normal, perform the High Voltage Disabling procedure and test the HVIC Return circuit for an open between X350 and BECM connector X1. If the circuit tests normal, replace the BECM.
- If less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.WARNING: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:- Identify how to disable high voltage.
- Identify how to test for the presence of high voltage.
- Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.IMPORTANT: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1. - If the circuit tests normal, perform the High Voltage Disabling procedure and test the HVIC Source circuit for an open between X350 and BECM connector X1. If the circuit tests normal, replace the BECM.
- If within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
IMPORTANT:
DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the drive motor generator power inverter control module (PIM).
IMPORTANT:
The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC current loop.