LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2006 >> Sierra 1500 HD, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1075 (Engine Mechanical - 6.6L (4 Of 5)) >> Off-Vehicle Repair Instructions (3 Of 4) >> Piston, Connecting Rod, and Bearing Installation >> Installation

Piston, Connecting Rod, and Bearing Installation: Installation

WARNING: This page is about a different car, the 2008 GMC Sierra, 2008 GMC Cab & Chassis Sierra, 2008 Chevrolet Silverado, and 2008 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of Connecting Rod Bearing & Connecting Rod Cap Bearing
    GM880613Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: The connecting rod bearing with the notch all the way out against the edge of the bearing (2) is the connecting rod bearing. The connecting rod bearing with the notch "in board" (1) is the connecting rod cap bearing.
  1. Select the connecting rod bearing according to the Connecting Rod Bearings Selection Specifications chart.
  2. Position the crankshaft so the connecting rod journal is opposite the piston and connecting rod assembly being installed.
  3. Fig 2: View Of Connecting Rod Cap & Bearing Insert
    GM660550Courtesy of GENERAL MOTORS CORP.
  4. Install the connecting rod bearing inserts.
  5. Lubricate the cylinder wall and piston rings with engine oil.
  6. Install the J 8037  to the piston to compress the piston rings.
  7. Fig 3: View Of Piston Assembly
    GM1336121Courtesy of GENERAL MOTORS CORP.
  8. Orientate the piston front mark and the piston inside mark to the engine block.
  9. Fig 4: Pushing Piston & Connecting Rod Assembly Into Engine
    GM663806Courtesy of GENERAL MOTORS CORP.
    NOTE: The chamfered side of the connecting rod large journal ends must face away from each other on a common crankshaft journal. Placement of the chamfered side of the connecting rod large journal ends in any other direction or combination will cause damage to the crankshaft, connecting rod and connecting rod bearing.
  10. Push the piston and connecting rod assembly into the engine.
  11. Fig 5: View Of Connecting Rods
    GM663809Courtesy of GENERAL MOTORS CORP.
  12. Install the gauging plastic onto the connecting rod journal. Install the gauging plastic the full width of the journal.
  13. Install the connecting rod cap with its stamped cylinder number aligned with the stamped cylinder number on the connecting rod.
  14. NOTE: Refer to Fastener Notice .
  15. Install the original connecting rod cap bolts for the plastic gauging. NEW bolts will be used for final assembly.
  16. Tighten the bolts in three steps.

    Tighten: 

    1. 1st step 64 N.m (47 lb ft)
    2. 2nd step 30 degrees using J 45059 
    3. 3rd step 30 degrees using J 45059 

  17. Remove the connecting rod cap bolts.
  18. Compare the width of the gauging plastic with the scale printed on the gauging plastic container. The connecting rod bearing clearance should be 0.10 mm (0.0039 in).
  19. Discard the original connecting rod bolts once the plastic gauging is completed. NEW connecting rod bolts will be used for final assembly.
  20. Carefully clean the gauging plastic from the bearing surface and the crankpin.
  21. Lubricate the connecting rod bearing inserts with engine oil.
  22. Install the connecting rod caps with the stamped cylinder number aligned with the stamped cylinder number on the connecting rods.
  23. NOTE: This component uses bolts with a preapplied molybdenum disulfide coating for thread lubrication. Do not remove the coating or use any additional lubricant. Improperly lubricated threads will adversely affect the bolt torque and clamp load. Improper bolt torque and clamp load can lead to engine damage.
  24. Install NEW connecting rod cap bolts.
  25. Tighten the connecting rod cap bolts in three steps.

    Tighten: 

    1. 1st step 64 N.m (47 lb ft)
    2. 2nd step 30 degrees using J 45059 
    3. 3rd step 30 degrees using J 45059