Installation Procedure
- Install NEW intake manifold gaskets (1) to the intake manifold.
- Install the intake manifold.
- Apply a 5 mm (0.20 in) band of threadlock GM P/N 12345382 (Canadian P/N 10953489), or equivalent to the threads of the intake manifold bolts.
- Tighten the intake manifold bolts.
Tighten:
- Tighten the bolts a first pass in sequence to 5 N.m (44 lb in).
- Tighten the bolts a final pass in sequence to 10 N.m (89 lb in).
- Install the EVAP purge solenoid (3), isolator (1), and bolt (2) to the intake manifold.
Tighten: Tighten the bolt to 10 N.m (89 lb in).
- Install the EVAP purge solenoid vent tube to the solenoid (1) and vapor pipe (2).
- Install the MAP sensor (1) to the intake manifold.
- Install the PCV hose.
- If equipped with vacuum assisted brakes, install the vacuum brake booster hose to the rear of the intake manifold.
- Route the electrical harness into position over the engine.
- Connect the knock sensor harness electrical connector to the intake manifold.
- Connect the following electrical connectors.
- MAP sensor (1)
- Knock sensor (2)
- Install the fuel injectors. Refer to Fuel Injector Replacement in Engine Controls - 4.8L, 5.3L, and 6.0L.
- Install the throttle body. Refer to Throttle Body Assembly Replacement in Engine Controls - 4.8L, 5.3L, and 6.0L.
NOTE:
Refer to FASTENER NOTICE
in Cautions and Notices.
IMPORTANT:
Lightly coat the MAP sensor seal with clean engine oil before installing.