Shift Cable: Installation
WARNING: This page is about a different car, the 2003 GMC Savana and 2003 Chevrolet Chevy Express. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
Prior to installing the shift cable to the vehicle, ensure that the column shift lever and the transmission control lever are in the mechanical park position. The transmission control lever can be positioned to mechanical park by rotating the control lever clockwise until it reaches its full clockwise position.
- Install the shift cable to the vehicle. Raise the vehicle. Remove the black shipping tab from the transmission end of the shift cable and discard the tab.
- Install the shift cable to the transmission bracket. See Figure
. Install the cable clip. Install the shift cable end to the transmission shift control lever by pushing the cable end onto the transmission shift control lever stud ball. Lock the primary lock. Lock the secondary lock. Attach the shift cable to the fuel line and body clips. Lower the vehicle.NOTE: Ensure the shift lever is in the Park position.
- Install the rubber grommet to the floor panel. Install the shift cable to the steering column shift control. Install the clip securing the shift cable to the steering column bracket. Install the cable to the shift lever ball stud.
- Adjust shift cable. See SHIFT CABLE under ADJUSTMENTS. Install the knee bolster bracket. Install the knee bolster trim panel.