Installation Procedure
- Connect the I/P cluster harness (1) to the I/P cluster (2).
- Install the I/P cluster onto the I/P with the screws. Tilt the top of the cluster into the retainer first to avoid damaging the flexible circuit connections.NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
- Install the screws that retain the I/P cluster to the I/P assembly.
Tighten
Tighten the screws to 2 N.m (18 lb in).
- Install the I/P cluster trim plate bezel. Refer to BEZEL REPLACEMENT - INSTRUMENT PANEL (I/P) CLUSTER .