Installation Procedure
- Install the bezel to the console till it clicks in place.
- Install the storage bin. Refer to CONSOLE STORAGE BIN REPLACEMENT (EXPECT PRO) .
- Connect the electrical connectors (1, 2) to the upper bezel.
- Install the upper bezel till it clicks in place.
- Install the cluster bezel. Refer to BEZEL REPLACEMENT - INSTRUMENT PANEL (I/P) CLUSTER .