Installation Procedure
- Install the 12 volt power supply outlet to new bezel. Refer to 12-Volt Power Supply Replacement
- Connect the electrical connectors
- Install the retainers as shown in the graphic.
- Install the console extension to the I/P. Refer to Instrument Panel (I/P) Extension Replacement (PRO) .
- Install the center console four hold down retaining bolts. Refer to Console Replacement (Except PRO) or Console Replacement (PRO) .
- Install the I/P cluster bezel. Refer to Bezel Replacement - Instrument Panel (I/P) Cluster .