Installation Procedure
- Install the bezel to the console till it clicks in place.
- Install the storage bin. Refer to Console Storage Bin Replacement (Expect Pro) or Console Storage Bin Replacement (Pro) .
- Connect the electrical connectors (1,2) to the upper bezel.
- Install the upper bezel till it clicks in place.
- Install the cluster bezel. Refer to Bezel Replacement - Instrument Panel (I/P) Cluster .