Installation Procedure
- Lightly coat the new O-ring seal with mineral base 525 viscosity refrigerant oil.
- Install the new O-ring seal to the switch.NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
- Install the A/C low pressure switch (1) to the accumulator (3).
Tighten
Tighten the switch to 6 N.m (53 lb in).
- Connect the electrical connector to the A/C low pressure switch.
- Leak test the fittings of the component using the J 39400-A.