LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 955 (Battery, Charging System & Starting System) >> Repair Instructions >> Energy Storage Box (ESB) Service Disconnect Power Cable Replacement (5.3L Engine w/RPO HP2) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
    IMPORTANT: Ensure that the power cable is installed to the negative side of the HCC.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  1. Install the service disconnect power cable (2) to the HCC and service disconnect switch.
  2. Install the service disconnect power cable nuts (1) to the HCC and the service disconnect switch.

    Tighten:  Tighten the nuts to 10 N.m (89 lb in).

  3. Fig 1: View Of Service Disconnect Power Cable & Nut (5.3L Engine w/RPO HP2)
    GM1403628Courtesy of GENERAL MOTORS CORP.
  4. Install the ESB intermediate cover. Refer to Energy Storage Box (ESB) Trim Cover Replacement (5.3L Engine w/RPO HP2) .