LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 955 (Battery, Charging System & Starting System) >> Repair Instructions >> Energy Storage Box (ESB) Power Cable Replacement - Battery 1 to Battery 2 (5.3L Engine w/RPO HP2) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the power cable (3) to battery 1 and battery 2.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the power cable nuts (1) to battery 1 and battery 2.

    Tighten:  Tighten the nuts to 10 N.m (89 lb in).

  4. Fig 1: View Of Battery Resistor, Power Cable & Nuts (Installed) (5.3L Engine w/RPO HP2)
    GM1338112Courtesy of GENERAL MOTORS CORP.
  5. Install the ESB intermediate cover. Refer to Energy Storage Box (ESB) Trim Cover Replacement (5.3L Engine w/RPO HP2) .