Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the HCC.
- Install the HCC screws.
Tighten: Tighten the screws to 5 N.m (44 lb in).
- Install the HCC power cable and nut to battery 3.
Tighten: Tighten the nut to 10 N.m (89 lb in).
- Install the service disconnect power cable and nut (1) to the HCC.
Tighten: Tighten the nut to 10 N.m (89 lb in).
- Connect the 42-volt positive/negative cable electrical connector (4).
- Install the red CPA retainer.
- Install the 42-volt positive/negative cable retainer and nuts.
Tighten: Tighten the nuts to 20 N.m (15 lb ft).
- Install the ESB intermediate cover. Refer to Energy Storage Box (ESB) Intermediate Cover Replacement (5.3L Engine w/RPO HP2) .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.
Fig 4: View Of 42-Volt Positive/Negative Cable Electrical Connector, AC Electrical Connector, Ground Strap & Stud