LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 955 (Battery, Charging System & Starting System) >> Repair Instructions >> Energy Storage Box (ESB) Cut Off Switch Replacement (5.3L Engine w/RPO HP2) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: A NEW battery cut off switch comes in the open position for safety concerns. The service part will need to be closed with a scan tool after the part has been installed.
  1. Install the battery cut-off switch (1).
  2. Fig 1: View Of High Current Sensor & Battery Cut-Off Switch (5.3L Engine w/RPO HP2)
    GM1456043Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the battery cut off switch nuts (3).

    Tighten:  Tighten the nuts to 10 N.m (89 lb in).

  4. Connect the battery cut-off switch electrical connector (3).
  5. Fig 2: View Of Battery Cut-Off Switch, Electrical Connectors & Nuts (5.3L Engine w/RPO HP2)
    GM1403624Courtesy of GENERAL MOTORS CORP.
  6. If a NEW switch was installed, use a scan tool and command the battery cut-off switch to the closed position.
  7. Install the ESB intermediate cover. Refer to Energy Storage Box (ESB) Intermediate Cover Replacement (5.3L Engine w/RPO HP2) .