Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Feed the 120-volt cable (1) through the receptacle opening (2) in the ESB.
- Route the 120-volt cable as noted earlier.
- Connect the retainers securing the 120-volt cable within the ESB.
- Install the 120-volt cable connector screws.
Tighten: Tighten the screws to 6 N.m (53 lb in).
- Install the receptacle outlet cover screws (1).
Tighten: Tighten the screws to 0.5 N.m (4.4 lb in).
- Install the ESB intermediate cover. Refer to Energy Storage Box (ESB) Trim Cover Replacement (5.3L Engine w/RPO HP2) .
- Connect the 120-volt AC electrical connector (3).
NOTE:
Refer to Fastener Notice
in Cautions and Notices.