Installation Procedure
WARNING: This page is about a different car, the 2002 Chevrolet Malibu. However, it is still accessible from the selected car via links, so may be relevant.
- Install the upper intake manifold gaskets on the manifold.CAUTION: Refer to FASTENER NOTICE in Cautions and Notices.
- Apply thread lock GM P/N 12345382 to the threads of the bolts.
Install the upper intake manifold bolts.
Tighten
Tighten the upper intake manifold bolts to 25 N.m (18 lb ft).
- Install the MAP sensor (1). Refer to MANIFOLD ABSOLUTE PRESSURE SENSOR in Engine Controls.
- Install EGR pipe.
- Install inlet and outlet hoses from throttle body (1).
- Install the vacuum hose (1) to the fuel pressure regulator (3) and the crankcase ventilation valve (2).
- Connect the TP sensor.
- Connect the IAC.
- Connect the fuel injector harness.
- Install the EVAP canister purge solenoid.
- Install the electronic ignition coil and module assembly. Refer to IGNITION CONTROL MODULE in Engine Controls.
- Install throttle cable bracket and cables to throttle body.
- Install the top half of the air cleaner assembly.
- Install the brake vacuum pipe.
- Fill the cooling system. Refer to DRAINING AND FILLING COOLING SYSTEM in Engine Cooling.
- Inspect for proper fluid levels.
- Inspect for leaks.