Installation Procedure
WARNING: This page is about a different car, the 2002 Chevrolet Malibu. However, it is still accessible from the selected car via links, so may be relevant.
- If removed, install the thermostat.
- If removed, install the water outlet.CAUTION: Refer to FASTENER NOTICE in Cautions and Notices.
- Install the water outlet bolts.
Tighten
Tighten the water outlet bolts to 25 N.m (18 lb ft).
- If removed, install the ECT sensor.
Tighten
Tighten the ECT sensor to 23 N.m (17 lb ft).
- Apply 8 - 12 mm (0.08-0.11 in) bead of RTV Sealer, GM P/N 12345739 or equivalent, on each ridge where front and rear of the lower intake manifold contact the engine block (1).
- Install the lower intake manifold gaskets.
- Install rocker arms and pushrods. Refer to Valve Rocker Arm and Push Rod Replacement .
- Install the lower intake manifold.
- Apply sealant, GM P/N 12345382 to the threads of the lower intake manifold bolts.CAUTION: An oil leak may result if the vertical bolts are not tightened before the diagonal bolts.
- Install the vertical lower intake manifold bolts until snug.
- Install the diagonal lower intake manifold bolts until snug.
- Tighten the lower intake manifold bolts.
- Connect the heater inlet pipe and heater hose to the lower intake manifold.
- Install the power steering pump to the front engine cover. Refer to POWER STEERING PUMP in Power Steering System.
- Install the fuel injector rail. Refer to FUEL RAIL & INJECTORS in Engine Controls - 3.1L.
- Connect the ECT sensor electrical connector.
- Install the upper intake manifold. Refer to Intake Manifold Replacement - Upper .
- Install the valve rocker covers. Refer to Valve Rocker Arm Cover Replacement - Right (Rear) and Valve Rocker Arm Cover Replacement - Left (Front) .